Case Studies

ITC Rajputana- Cleaning of Jhoomar

Problem Statement- A Jhoomer at the main reception hall of the Hotel had to be cleaned, and the hotel had only 5 hours to spare till the guests woke up.

Discover more

Singapore Airline Terminal- Delhi T3

Problem Statement- The client required glass roof glazing at a height of 14.2 mts at the Airport terminal.


Discover more

Hanging Scaffold- The First In India

Problem Statement-  Work Platform requirement for MEP work at 24m height without blocking the ground space.


Discover more

IICC Dwarka, New Delhi

Problem Statement-  Needed a single solution for several contractors hired by L&T without taking up space in the ground area.

Y Equipment Solution- 

We provided a hanging scaffold solution to L&T, which was convenient for several electrical and mechanical contractors to work at a single time. 

Following pain points were solved- 

  • Freed up the complete ground area, thus creating better mobility. 
  • Several smaller contractors could work at the same time, which saved a lot of time and energy for L&T to arrange work at height solutions for each contractor individually.
  • Machinery and tools could be carried in one go, thus helping save a lot of time.  

Mumbai Metro Project

Problem Statement-  Needed to work on the 3-9 o clock part of the tunnel which was difficult to access

Discover more

HPCL Barmer  Refinery   Project

Problem Statement-  Required working on pipe racks which is difficult with a conventional scaffolding system.

Y Equipment Solution-  

We provided a hanging solution to the client, which ensured safety along with maximum productivity

Pain points we resolved- 

  • Freed up the entire ground area for a cleaner operation
  • Created an easy to access hanging scaffold that facilitated work on pipe racks 
  • No other platform was required, and all the equipment and workers could use the same hanging platform for their work. 

Case: DMRC Phase-4 Metro Project

Problem Statement-  Client Required a solution to work on metro tracks that could be customized in length due to certain constraints, but our current designs could only support 850 mm or 1450 mm extensions.

Y Equipment  Solution

We provided a customized cantilever solution, 5 mt in height with adjustable handrail, and the cantilever was designed with our beam system, that could be adjusted to different lengths.

Pain Points Resolved

  • Adjustable cantilever solution provided that allowed the customer to work on the desired location with safety
  • Adjustable handrails helped the customer reach different heights at different times with ease
  • The Scaffold could be easily moved on the tracks, thus reducing down time and increasing productivity

RRTS Project Meerut (AFCONS Infrastructure)

Problem Statement

Customer was looking at purchasing scaffolds instead of renting them due to his own mind constraints. This was leading to higher operational cost, less productivity and inventory management by the company.

Y Equipment  Solution-  

Along with providing solutions to our customers, we at Youngman also try to solve problems that the customer faces while working at height. Keeping that in mind, we had a meeting with the decision makers of the company to discuss the benefits of renting over purchase, and offered them the best possible solution at a reasonable cost that could fit their budgets with ease.

Pain points we resolved-     

  • Demo Sessions and trainings were provided to the customer on site, helping improve safety and productivity. 
  • Customer realized the benefits of renting over purchase when working for smaller durations.

We have helped more than 4000 worksites with safe and innovative Work-At-Height solutions. Get in touch with us with your requirements, and we will not disappoint.